The four numbers to specify first
Record the model and precision, maximum prompt length, number of simultaneous requests and acceptable response delay. A count of employee accounts is not a concurrency requirement. Twenty staff who occasionally ask a question can be an easier workload than three developers running long agent tasks.
Memory must cover weights, runtime buffers, context state and other services. Storage must hold more than one model version if rollback is required. A model file fitting on disk says nothing about how well it will run.
Compare the practical options
| Platform | Useful for | Main trade-off |
|---|---|---|
| 128GB GB10 appliance | A bounded private assistant or development pilot with a compact model. | Large shared-memory capacity does not imply high bandwidth or high concurrency. |
| Mac Studio | Apple-compatible local inference and office-friendly deployments. | Validate the exact runtime, model and memory configuration; CUDA software needs a different route. |
| Professional GPU workstation | A shared model that fits in GPU memory and benefits from faster serving. | GPU cost, cooling, power and the complete system warranty. |
| Multi-GPU rack server | Larger models and workloads that justify dedicated infrastructure. | Interconnect, sharding, facilities, recovery and operational staffing. |
What the current Singapore prices establish
A local reseller snapshot dated 28 October 2026 lists the ASUS Ascent GX10 from S$8,100, DGX Spark at S$8,800 and an RTX PRO 6000 Workstation Edition card at S$31,099. These are advertised prices, not our purchase quotations; tax treatment, configuration, stock and support must be confirmed.
Apple’s current Singapore specification lists M5 Max and M5 Ultra Mac Studio options, with configurations up to 512GB unified memory. Do not price a high-memory build from the base-model headline. Obtain the exact configured quotation and delivery date.
Why four used gaming GPUs are a different proposition
A used multi-GPU rig may be attractive for experimentation, but assess slot spacing, PCIe topology, power, cooling and who will replace a failed card. Four devices do not become one transparent memory pool. The serving engine must support the selected distribution or offload strategy.
A low hardware purchase price can be offset by setup time and downtime. For a client deployment, compare the full supported system and spare-part plan rather than the sum of advertised card prices.
Specify the installation and acceptance
Ask the supplier for the complete bill of materials, supported GPU configuration, warranty scope and service route in Singapore. Have the site’s responsible facilities professional assess power and cooling; a nominal socket rating is not an installation design.
Before acceptance, run the actual prompt distribution and simultaneous users, then test restart, backup restoration and a failed request. Keep the model revision, precision, engine version and measurement conditions in the report.
Four budgets inside the same machine
- Model weights: the exact downloaded format, including any vision or auxiliary components.
- Working memory: KV cache, runtime buffers and other model-specific state.
- Application services: document extraction, embeddings, search, interface and operating system.
- Headroom: parallel requests, larger inputs and controlled growth without paging or abrupt failures.
Confirm the physical installation.
Ask the system vendor for maximum and typical power, input and cooling requirements, dimensions, acoustics and on-site warranty terms. Have the facilities team or qualified electrical contractor confirm the circuit, UPS and cooling design. A socket’s nominal rating is not a safe continuous-load design.
Measure sustained operation after installation. Do not estimate electricity from a GPU’s advertised power alone or assume a desktop is silent under a long inference workload.
Sources & further reading
Sources checked 31 October 2026. Project recommendations and budget estimates are Koro’s analysis; confirm current terms before procurement.
