A proposed workflow for your team. These articles describe implementation ideas and acceptance tests, not client case studies or measured results.
Skip to technical implementation ↓ · Explore all 100 industry workflows →
The risk sits between documents
A tender pack can include a bill of quantities, specifications, drawings, addenda and bidder qualifications. A scope item may appear in one document and be absent or described differently in another. Reviewing those gaps requires careful cross-referencing.
A local assistant could prepare a candidate discrepancy register and a source-linked comparison. It would not certify quantities, price a tender autonomously or interpret contractual liability. The quantity surveyor remains responsible for measurement, commercial judgement and the final submission.
Make a gap concrete enough to resolve
The reviewer selects a package and the approved tender versions. The assistant groups relevant BOQ items, specification sections and clarification responses, then proposes questions with direct references.
If an addendum changes a specification but the corresponding schedule has not been updated, the register should show both versions. A bidder’s qualification should remain attributed to that bidder, not become a change to the employer’s requirements. Missing detail is a clarification item, not permission for the model to invent an allowance.
The surveyor checks the proposed gaps, records their commercial significance and decides what to ask or price. The assistant can reduce cross-reference work while preserving the distinction between a possible discrepancy and a reviewed tender risk.
Where local processing can help
Tender documents and pricing positions can be highly confidential. A local system may support a controlled bid workspace and reduce external processing of commercially sensitive comparisons.
A hosted API may provide convenient burst capacity during tender deadlines. Compare long-document accuracy, handling of tables and the cost of verification. Local infrastructure still needs secure access for temporary bid teams and a retention process when the bid closes. It cannot compensate for incomplete tender documents or supply authoritative interpretation from general model knowledge.
Use retrieval and calculation for different jobs
Retrieve the applicable clauses and schedule items with their revisions. Use ordinary, validated spreadsheet or application logic for arithmetic and quantity calculations. The model can explain source relationships and draft clarification wording.
Fine-tuning may help classify tender clauses or follow the practice’s discrepancy-register format. It should not learn a universal price or scope assumption from historical jobs. Keep project-specific commercial decisions outside reusable model weights and evaluate the baseline before commissioning training.
Pilot on a tender with a known clarification record
Use an approved completed tender and compare the assistant’s candidate gaps with the reviewed clarification history. Measure missed material differences, false matches, incorrect units and surveyor checking time.
Include alternate options, provisional items and an addendum issued late in the process. Test replacing a source schedule after annotations exist. The application should identify affected comparisons rather than overwrite the surveyor’s decisions or claim the whole tender has been rechecked.
For your IT and implementation team
The workflow above in technical terms: architecture, data preparation, access controls and evaluation.
Technical implementation: preserve schedule structure
Store project, package, BOQ item, specification section, revision and tender issue date. Parse tables with units, quantities, headers and footnotes intact. Use exact item references before semantic matching, and keep alternate options as distinct scenarios.
Generate structured gap records with source pairs, candidate issue, uncertainty and review status. Perform arithmetic through deterministic tools with visible inputs. The LLM should not create unsupported quantities, rates or contractual conclusions to complete a row.
Technical acceptance and bid confidentiality
Evaluate merged cells, missing pages, unit mismatches, superseded addenda and cross-bidder leakage. Test prompt injection in tender attachments. Score false material discrepancies separately from minor wording differences.
Version the source snapshot, preserve commercial annotations and restrict exports. Keep a manual review path and a clear incomplete state when parsing fails. The first release should not submit bids, issue clarifications or update pricing systems automatically.
Technical terms in this workflow
- BOQ
- Bill of quantities: a structured schedule whose items, units and quantities need careful source handling.
- Tender-gap register
- A reviewed list of potential scope or document inconsistencies, not an automatic valuation.
- Deterministic calculation
- Using explicit formulas and validated inputs for arithmetic while AI assists with document context.
Plan a local LLM pilot in Singapore
Koro Interactive can assess this workflow, compare local and approved hosted options, and scope the data integration, model evaluation, deployment and handover. Start with the task and acceptance criteria; select hardware after testing representative documents.
Local LLM consulting in Singapore → · Hardware and implementation budgets →